SPASA

AUS / NZ - DCCEEW Releases GEMS Swimming Pool Pump Determination Exposure Draft

November 19th, 2026

Background information

In early 2023, following industry feedback, SPASA sought clarification from the Department of Climate Change, Energy, the Environment and Water (the Department) regarding an ambiguity in the calculation of the Star Rating Index (SRI) for swimming pool pumps.

In March 2025, the Department released an Options Paper outlining potential solutions, and sought feedback from manufacturers, suppliers, and other industry stakeholders to help shape any necessary changes. As part of this process, SPASA hosted an Industry Stakeholder Meeting on 21 March 2025, bringing together key pool pump manufacturers to discuss the proposed changes.

The Industry Stakeholder group were able to reach a consensus as to the preferred option, which formed the basis of SPASA’s submission to the consultation.

See SPASA’s previous article covering the early stages of this process: https://www.spasa.com.au/news/au-nz-meps-pool-pump-star-ratings

What’s happening now?

DCCEEW is now consulting on suggested updated requirements for swimming pool pumps under the Greenhouse and Energy Minimum Standards (GEMS) Act 2012 (the GEMS Act).

The energy efficiency of these pumps is already regulated under the GEMS Act. It is being proposed that how star ratings and minimum energy performance standards (MEPS) are calculated will be updated. The new calculations will better reflect the energy performance of pumps, replacing the nameplate input power with a measured input power. 

A requirement to display the GEMS registration number is also being introduced.

Of special note is the proposed commencement date of 10 November 2027, with a 6-month grandfathering period. 

I would like more information

You can read the exposure draft determination and other documents on the department’s consultation hub: https://consult.dcceew.gov.au/proposed-updates-to-swimming-pool-pumps-energy-efficiency-regulations

There will be a consultation forum on Tuesday 24 November at 2pm AEDT. The department will provide an overview of the proposed changes, explain the supporting guidance materials, and answer questions to help stakeholders prepare informed submissions. RSVP via this link if you are interested in attending.

How can I have my say?

  • Make your submissions via the consultation hub by 6 January 2027.

  • You can also provide your feedback directly to SPASA for inclusion in a collated member submission, but to be included, you must email [email protected] your feedback before the 18th of December. 

ccc-web-banner.png
spasa-choose-a-spasa-member.png
spasa-training-web-banners-1790814144.png
Subscribe to SPASA today
Get the latest updates direct to your inbox.